[SMM Weekly Manganese Ore Review] South32's overseas market offers rise, spot price edges up slightly

Published: Jul 25, 2025 19:11
As of Friday this week, at northern ports: Australian lump ore was priced at 40.2-40.7 yuan/mtu, up 1.25% WoW from last Friday; South African semi-carbonate ore was priced at 33.9-34.4 yuan/mtu, unchanged WoW from last Friday; Gabonese ore was priced at 39-39.8 yuan/mtu, up 2.60% WoW from last Friday; South African high-iron ore was priced at 29.4-29.7 yuan/mtu, up 0.34% WoW from last Friday; South African medium-iron ore was priced at 34.2-34.7 yuan/mtu, up 1.47% WoW from last Friday. At southern ports: Australian lump ore was priced at 39.9-40.4 yuan/mtu, up 0.50% WoW from last Friday; South African semi-carbonate ore was priced at 34-34.5 yuan/mtu, unchanged WoW from last Friday; Gabonese ore was priced at 39.3-39.8 yuan/mtu, up 1.28% WoW from last Friday; South African high-iron ore was priced at 29.7-30.2 yuan/mtu, up 3.45% WoW from last Friday; South African medium-iron ore was priced at 34.6-35.1 yuan/mtu, up 1.75% WoW from last Friday. In the overseas market, South32's offer for South African semi-carbonate lump ore with a September 2025 shipment date to China was $4.05/mtu (up $0.15), and the offer for Australian lump ore was $4.45/mtu (up $0.1). Coupled with the recent positive market sentiment in the domestic manganese ore market, miners have maintained firm offers, with Australian lump ore, Gabonese lump ore, South African high-iron ore, and South African medium-iron ore all experiencing varying degrees of increases...

As of this Friday, in northern ports: Australian lump ore was priced at 40.2-40.7 yuan/mtu, up 1.25% WoW from last Friday; South African semi-carbonate ore was priced at 33.9-34.4 yuan/mtu, unchanged WoW from last Friday; Gabonese ore was priced at 39-39.8 yuan/mtu, up 2.60% WoW from last Friday; South African high-iron ore was priced at 29.4-29.7 yuan/mtu, up 0.34% WoW from last Friday; South African medium-iron ore was priced at 34.2-34.7 yuan/mtu, up 1.47% WoW from last Friday.

In southern ports: Australian lump ore was priced at 39.9-40.4 yuan/mtu, up 0.50% WoW from last Friday; South African semi-carbonate ore was priced at 34-34.5 yuan/mtu, unchanged WoW from last Friday; Gabonese ore was priced at 39.3-39.8 yuan/mtu, up 1.28% WoW from last Friday; South African high-iron ore was priced at 29.7-30.2 yuan/mtu, up 3.45% WoW from last Friday; South African medium-iron ore was priced at 34.6-35.1 yuan/mtu, up 1.75% WoW from last Friday.

In the overseas market, South32's offer for South African semi-carbonate lump ore with a September 2025 shipment date to China was $4.05/mtu (up $0.15), and the offer for Australian lump ore was $4.45/mtu (up $0.1). Coupled with the recent positive market sentiment in the domestic manganese ore market, miners' offers remained firm. Australian lump ore, Gabonese lump ore, South African high-iron ore, and South African medium-iron ore all saw varying degrees of increase.

Downstream, the SiMn spot market operated steadily, with SiMn futures fluctuating at highs. There was a limit-up today, and market sentiment was high. The acceptance of high-priced manganese ore improved, driving forward high-priced transactions of manganese ore. This week, SiMn plants maintained just-in-time procurement of manganese ore without significant stockpiling. There was still a mindset to drive down prices, and procurement remained cautious.

Overall, recent offers in the manganese ore market remained firm, but transaction negotiations continued. The future spot price of manganese ore should continue to be monitored for the impact of overseas market offers and domestic sentiment.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
3 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
3 hours ago
[SMM Weekly Manganese Ore Review] South32's overseas market offers rise, spot price edges up slightly - Shanghai Metals Market (SMM)